Four traffic options for the High Street and London Road, from a one-way loop to access only, are tested in the town council's final masterplans. None is chosen.
A one-way loop through Sevenoaks town centre is one of four traffic options in a masterplan the town council has now published in full. The plan does not choose between them.
Sevenoaks Town Council put the final Town Centre and St John’s Hill Area masterplans on its website and announced them on Wednesday 25 November. Its Planning and Environment Committee formally adopted them in April 2026. Consultants Urban Initiatives wrote both plans, with transport specialists Urban Movement (Sevenoaks Town Council, masterplans published; masterplanning page).
The four traffic options
The town centre plan looks at the triangle formed by the High Street, London Road and Pembroke Road. It says the routes can be congested at peak hours and that pavements are narrow in places. On one stretch of London Road the footway is 1.35 metres wide (Town Centre Masterplan, final report).
The options are:
- Option 1: keep two-way traffic, with narrower carriageways and some parking removed to widen the pavements
- Option 2A: a one-way loop, with southbound traffic on the High Street and northbound on London Road; Pembroke Road stays two-way
- Option 2B: the same, but London Road stays two-way
- Option 3: an access-only High Street, which would send all through traffic along London Road
- Option 4A: an access-only London Road, keeping servicing and two-way access to the M&S car park
- Option 4B: an access-only London Road, but with two-way traffic between South Park and the High Street junction
The one-way loop grew out of a 2021 proposal by local architect Roger Fitzgerald. Options 2B and 4B were added after residents raised them at the consultation events.
What the plan says about each
The report finds weaknesses in all of them.
Keeping two-way traffic leaves too little space for the wider pavements and cycle routes the plan wants. The one-way loop frees less room than it first appears, because Kent County Council is likely to want a lane wide enough to pass a broken-down vehicle. The report suggests a contraflow cycle lane could fill that role.
Closing the High Street to through traffic would push more cars onto London Road, which the report calls “particularly hostile” already. It would also mean a different approach to the bus station, perhaps as part of the leisure centre site.
The report lists several advantages for an access-only London Road. The High Street is wider and could take more traffic, and the bus station would not have to move. The drawback is access to the South Park car park, or, under 4B, the setting of a new public space outside the Stag.
“A preferred option has not been selected at this stage,” the report says.
Nothing changes yet
The town council is clear that it is not about to change the roads. Its question and answer sheet says any option, “such as around the Town Centre triangle”, would need detailed modelling, an impact assessment and public consultation. “Sevenoaks Town Council is not proposing to introduce these itself, nor to promote their delivery without much more comprehensive investigation,” it says (Masterplans FAQ).
The roads belong to Kent County Council as highway authority. The report suggests one cheap way to test an idea: a short trial closure, perhaps tied to a town centre event.
The sites earmarked for development
The town centre plan gives design guidance for four sites:
- Land East of the High Street, the district council’s scheme with a new leisure centre, homes, a cultural hub and market hall, and a new public space on the Buckhurst Lane car park
- the Post Office and BT exchange on South Park, where the plan suggests three storeys plus a set-back storey and space to extend the Stag or support it
- the former Edward’s Electrical site at the Vine end of the High Street, for homes with shops or workspace below
- the station area, with a possible new station building and “Station Square”, a multi-storey car park and homes of four to six storeys on most of the current car park
The district council’s Land East scheme is already under way. Its auditors flagged the roughly £138 million project this week (our report).
St John’s Hill
The second plan covers the St John’s and Hollybush shopping parades. It proposes three new public spaces:
- St John’s Place, a small square behind the shops on St John’s Hill
- Bat and Ball Gardens, a green space on a new route to Bat and Ball station, with a gap knocked through the wall on Bat and Ball Road
- Hollybush Square, made by closing the southern end of Bradbourne Road and taking in Rheinbach Gardens
The St John’s and St James car parks have 71 spaces. On the days the consultants counted, no more than 41 were used at once, under 60 per cent. Many residents describe the area as feeling unsafe, the plan says. The plan suggests a “St John’s Quarter” of workshops and homes around a smaller, greener car park, built in three phases because the land has several owners (St John’s Hill Area Masterplan, final report).
Other ideas include wider pavements and trees on St John’s Hill and Chatham Hill Road, and a better footbridge on Bat and Ball Road for pushchairs and bikes.
Why the plans exist
The district must find land for 1,145 homes a year, or 17,175 by 2042, the town council says. A significant share is likely to be built around these two centres. The masterplans are meant to make sure new housing brings the paths, crossings and public spaces with it (Masterplans FAQ).
The district council has agreed to name them in Policy SEV1 of its draft Local Plan. Councillors vote on 1 December on whether to submit that plan for examination (our preview).
Bigger schemes such as junction changes would be paid for through Section 106 deals or the Community Infrastructure Levy. The town council receives 25 per cent of CIL collected in its area and can bid for more. Smaller ideas, from street trees to signs and events, it could deliver itself.
Early wins
The town centre plan lists cheaper changes that could come first:
- parklets, street greening and less signage clutter
- “pay on exit” parking, which the report says encourages longer visits than paying on arrival
- more markets, music and events in the centre itself
- public art and lighting, and pop-up shops in empty units
- better signs linking the High Street with Knole Park
The town is starting from a strong position. A March 2026 town council study found 95 per cent of ground-floor shop units occupied. The report puts the national vacancy rate at 12 to 13 per cent.
What it means for you
Nothing on the roads changes because of these documents. They are guidance for developers and planners, and for the town council’s own spending. If a traffic option is ever taken forward, it would come back for public consultation first.
Both final plans and the consultation reports are on the town council’s masterplanning page. Planning applications for the sites above will appear on the district council’s planning portal, and our planning applications page explains how to comment. Parking options in town are on our parking guide.
Sources
- Sevenoaks Town Council, adopted Town Centre and St John’s Hill Area Masterplans published, 25 November 2026
- Sevenoaks Town Council, Masterplanning for the Town Centre and St John’s Area
- Urban Initiatives, Sevenoaks Town Centre Masterplan, final report, July 2026
- Urban Initiatives, St John’s Hill Area Masterplan, final report, July 2026
- Sevenoaks Town Council, Masterplans: frequently asked questions
Image: Sevenoaks High Street by DS Pugh, CC BY-SA 2.0, via Geograph and Wikimedia Commons (https://commons.wikimedia.org/wiki/File:Sevenoaks_High_Street_-geograph.org.uk-_8349985.jpg).
Have your say